US FDA White Oak Campus

Silver Spring, MD

Client: General Services Administration

Contract Value: $620,822

Expertise Highlights & Project Features: Design-Build; New Construction; Hardscapes

Westerly completed this project to design-build a new fitness path with benches and an open exercise area with outdoor equipment to accommodate 4 to 6 people at a time. The construction activities included site clearing of a grassy area, demolition, and excavation to construct a 5’x 0.5-mile fitness path. Once the path was excavated, the appropriate backfill and asphalt paving were performed. Around the fitness path, we constructed a fitness area that contained outdoor fitness equipment. Surrounding the entire fitness path, Westerly performed landscaping and installed benches around the path. Westerly is experienced in working with cold and hot weather conditions. Throughout the course of construction, we encountered a historic wet weather season that delayed the project excavation, paving, and landscaping. The wet weather impacted hydroseeding the area to grow new grass. We remained persistent and worked with the client to identify the seasonal time to seed the cleared area and grow new grass. Westerly maintained the highest level of safety during all construction activities and installed construction signage for pedestrian traffic control during heavy construction.


© Westerly Enterprises, LLC. All rights reserved.
Website and SEO by Original Account Strategies.